ADC16DX370EVM

Mfr. #: ADC16DX370EVM
製造商: Texas Instruments
描述: Data Conversion IC Development Tools ADC16DX370EVM
生命週期: 製造商新產品
數據表: ADC16DX370EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC16DX370EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 4 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, USB Compatible with ADC16DX370. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADC16DX370EVM Image

ADC16DX370EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC16DX370EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • Shipping Restrictions:
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADC16DX370
  • Operating Supply Voltage: 4 V
  • Description/Function: dual-channel, 16-bit ADC capable of operating at sampling rates up to 370 MSPs
  • Series: ADC16DX370
  • Brand: Texas Instruments
  • Interface Type: SPI, USB
  • For Use With: ADC16DX370
  • Operating Supply Current: 2 A
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADC16DX370EVM

ADC16DX370EVM Specifications

ADC16DX370EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 4 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is SPI, USB.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is ADC16DX370.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top