ADC32J22EVM

Mfr. #: ADC32J22EVM
製造商: Texas Instruments
描述: Data Conversion IC Development Tools ADC32J22EVM
生命週期: 製造商新產品
數據表: ADC32J22EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC32J22EVM Overview

This product is manufactured by Texas Instruments. Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.262491 oz of Unit Weight

ADC32J22EVM Image

ADC32J22EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC32J22EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Packaging: Bulk
  • Series: ADC3423
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.262491 oz

ADC32J22EVM

ADC32J22EVM Specifications

ADC32J22EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.262491 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top