ADC32RF45EVM

Mfr. #: ADC32RF45EVM
製造商: Texas Instruments
描述: Data Conversion IC Development Tools ADC32RF45 Eval Module
生命週期: 製造商新產品
數據表: ADC32RF45EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC32RF45EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADC32RF45EVM Image

ADC32RF45EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC32RF45EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • Shipping Restrictions:
  • RoHS: N
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADC32RF45
  • Operating Supply Voltage: 5 V
  • Description/Function: Evaluates the ADC32RF45 family of high-speed, JESD204B interface ADCs
  • Series: ADC32RF80
  • Brand: Texas Instruments
  • Interface Type: USB
  • Operating Supply Current: 3 A
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADC32RF45EVM

ADC32RF45EVM Specifications

ADC32RF45EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top