ADS112C04EVM

Mfr. #: ADS112C04EVM
製造商: Texas Instruments
描述: Data Conversion IC Development Tools ADS112C04EVM
生命週期: 製造商新產品
數據表: ADS112C04EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS112C04EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 3.3 V, 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS112C04EVM Image

ADS112C04EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS112C04EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADS122C04
  • Operating Supply Voltage: 3.3 V, 5 V
  • Series: ADS112C04
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS112C04EVM

ADS112C04EVM Specifications

ADS112C04EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V, 5 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C, USB

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top