ADS5463EVM-CVAL

Mfr. #: ADS5463EVM-CVAL
製造商: Texas Instruments
描述: Data Conversion IC Development Tools ADS5463 EVAL MOD
生命週期: 製造商新產品
數據表: ADS5463EVM-CVAL 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5463EVM-CVAL Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS5463EVM-CVAL Image

ADS5463EVM-CVAL

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5463EVM-CVAL Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • Shipping Restrictions:
  • RoHS: E
  • Series: ADS5463
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS5463EVM-CVAL

ADS5463EVM-CVAL Specifications

ADS5463EVM-CVAL FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top