ADS54J66EVM

Mfr. #: ADS54J66EVM
製造商: Texas Instruments
描述: Data Conversion IC Development Tools ADS54J66EVM
生命週期: 製造商新產品
數據表: ADS54J66EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS54J66EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: JESD204B, USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS54J66EVM Image

ADS54J66EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS54J66EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • Shipping Restrictions:
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADS58J63, ADS54J66
  • Operating Supply Voltage: 5 V
  • Description/Function: ADS58J63, ADS54J66 high speed, JESD204B interface ADCs
  • Series: ADS54J66
  • Brand: Texas Instruments
  • Interface Type: JESD204B, USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS54J66EVM

ADS54J66EVM Specifications

ADS54J66EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed JESD204B, USB

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top