| Mfr. #: | ADS62P15EVM |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | Data Conversion IC Development Tools ADS62P15 Eval Mod |
| 生命週期: | 製造商新產品 |
| 數據表: | ADS62P15EVM 數據表 |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the ADC type. 3.3 V to 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SMA, SPI Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS62P15EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: What is the Type of the product?
Q: The Type of the product is ADC.
A: What is the Operating Supply Voltage of the product?
Q: The Operating Supply Voltage of the product is 3.3 V to 5 V.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the Interface Type of the product?
Q: The Interface Type of the product is SMA, SPI.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.