ADS7044EVM-PDK

Mfr. #: ADS7044EVM-PDK
製造商: Texas Instruments
描述: Data Conversion IC Development Tools 12-bit, diff Input SAR ADC Demo Kit
生命週期: 製造商新產品
數據表: ADS7044EVM-PDK 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7044EVM-PDK Overview

This product is manufactured by Texas Instruments. Demonstration Kits This device belongs to the ADC type. 1.8 V to 3.6 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SPI Compatible with ADS7044. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS7044EVM-PDK Image

ADS7044EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7044EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Demonstration Kits
  • Type: ADC
  • Tool Is For Evaluation Of: ADS7044
  • Operating Supply Voltage: 1.8 V to 3.6 V
  • Series: ADS7044
  • Brand: Texas Instruments
  • Interface Type: SPI
  • For Use With: ADS7044
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS7044EVM-PDK

ADS7044EVM-PDK Specifications

ADS7044EVM-PDK FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Demonstration Kits.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 1.8 V to 3.6 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is SPI.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed ADS7044

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top