ADS850-EVM

Mfr. #: ADS850-EVM
製造商: Texas Instruments
描述: Data Conversion IC Development Tools ADS850- Eval Mod
生命週期: 製造商新產品
數據表: ADS850-EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS850-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the ADC type. Texas Instruments is a trusted brand for quality electronics Interface Type: SMA Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS850-EVM Image

ADS850-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS850-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • Shipping Restrictions:
  • RoHS: N
  • Product: Evaluation Boards
  • Type: ADC
  • Tool Is For Evaluation Of: ADS850Y
  • Brand: Texas Instruments
  • Interface Type: SMA
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS850-EVM

ADS850-EVM Specifications

ADS850-EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is SMA.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top