ADS8568EVM-PDK

Mfr. #: ADS8568EVM-PDK
製造商: Texas Instruments
描述: Data Conversion IC Development Tools ADS8568 Perf Dem Kit
生命週期: 製造商新產品
數據表: ADS8568EVM-PDK 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8568EVM-PDK Overview

This product is manufactured by Texas Instruments. Demonstration Boards This device belongs to the ADC and DAC type. 15 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: Serial Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS8568EVM-PDK Image

ADS8568EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8568EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Demonstration Boards
  • Type: ADC and DAC
  • Tool Is For Evaluation Of: ADS8568
  • Operating Supply Voltage: 15 V
  • Series: ADS8568
  • Brand: Texas Instruments
  • Interface Type: Serial
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS8568EVM-PDK

ADS8568EVM-PDK Specifications

ADS8568EVM-PDK FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Demonstration Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC and DAC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 15 V

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is Serial.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top