AFE8406EVM

Mfr. #: AFE8406EVM
製造商: Texas Instruments
描述: RF Development Tools AFE8406 Eval Dght Bd
生命週期: 製造商新產品
數據表: AFE8406EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE8406EVM Overview

This product is manufactured by Texas Instruments. Development Kits 1.5 V to 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics RF Development Tools product type 1 of 100 Development Tools as subcategory

AFE8406EVM Image

AFE8406EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE8406EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: N
  • Product: Development Kits
  • Operating Supply Voltage: 1.5 V to 3.3 V
  • Description/Function: Daughter Board
  • Brand: Texas Instruments
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

AFE8406EVM

AFE8406EVM Specifications

AFE8406EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Development Kits

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 1.5 V to 3.3 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is RF Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top