BOOST-LMP92064EVM

Mfr. #: BOOST-LMP92064EVM
製造商: Texas Instruments
描述: Amplifier IC Development Tools BOOST-LMP92064 EVAL MOD
生命週期: 製造商新產品
數據表: BOOST-LMP92064EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BOOST-LMP92064EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory The product's BoosterPack is Blue Gecko.

BOOST-LMP92064EVM Image

BOOST-LMP92064EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BOOST-LMP92064EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Amplifier IC Development Tools
  • RoHS: Y
  • Series: BOOST-LMP92064EVM
  • Brand: Texas Instruments
  • Product Type: Amplifier IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: BoosterPack

BOOST-LMP92064EVM

BOOST-LMP92064EVM Specifications

BOOST-LMP92064EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Amplifier IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: Is the cutoff frequency of the product Tradename?

    Q: Yes, the product's Tradename is indeed BoosterPack

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top