BQ24100EVM

Mfr. #: BQ24100EVM
製造商: Texas Instruments
描述: Power Management IC Development Tools BQ24100 Eval Mod
生命週期: 製造商新產品
數據表: BQ24100EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24100EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Battery Management type. 5 V Input Voltage Output Voltage is 4.2 V Dimensions of 50.8 mm x 47 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.084736 oz of Unit Weight

BQ24100EVM Image

BQ24100EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24100EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ24100
  • Input Voltage: 5 V
  • Output Voltage: 4.2 V
  • Dimensions: 50.8 mm x 47 mm
  • Series: BQ24100
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.084736 oz

BQ24100EVM

BQ24100EVM Specifications

BQ24100EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Battery Management.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 5 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 4.2 V

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 50.8 mm x 47 mm.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.084736 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top