| Mfr. #: | BQ24155EVM |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools BQ24155EVM |
| 生命週期: | 製造商新產品 |
| 數據表: | BQ24155EVM 數據表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 4 V to 6 V Input Voltage Output Voltage is 4.44 V Output current: 1.25 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is 0 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24155EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Battery Management.
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 4 V to 6 V.
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 4.44 V.
A: What is the Output Current of the product?
Q: The Output Current of the product is 1.25 A.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is I2C.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 125 C.
A: Is the cutoff frequency of the product Minimum Operating Temperature?
Q: Yes, the product's Minimum Operating Temperature is indeed 0 C
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.