BQ76940EVM

Mfr. #: BQ76940EVM
製造商: Texas Instruments
描述: Power Management IC Development Tools Evaluation Module
生命週期: 製造商新產品
數據表: BQ76940EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ76940EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 66 V Input Voltage Output Voltage is 2.5 V/3.3 V Output current: 15 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C The product can operate at a maximum temperature of + 30 C. The minimum operating temperature of this product is + 20 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.245557 oz of Unit Weight

BQ76940EVM Image

BQ76940EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ76940EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ76940
  • Input Voltage: 66 V
  • Output Voltage: 2.5 V/3.3 V
  • Output Current: 15 A
  • Series: BQ76940
  • Brand: Texas Instruments
  • Interface Type: I2C
  • Maximum Operating Temperature: + 30 C
  • Minimum Operating Temperature: + 20 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.245557 oz

BQ76940EVM

BQ76940EVM Specifications

BQ76940EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Battery Management.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 66 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 2.5 V/3.3 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 15 A

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 30 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed + 20 C

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.245557 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top