CDCEL913PERF-EVM

Mfr. #: CDCEL913PERF-EVM
製造商: Texas Instruments
描述: Clock & Timer Development Tools CDCEL913PERF-EVM
生命週期: 製造商新產品
數據表: CDCEL913PERF-EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCEL913PERF-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Clock Synthesizers type. Frequency range: 230 MHz Texas Instruments is a trusted brand for quality electronics Interface Type: USB 1.8 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

CDCEL913PERF-EVM Image

CDCEL913PERF-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCEL913PERF-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Clock Synthesizers
  • Tool Is For Evaluation Of: CDCEL913
  • Frequency: 230 MHz
  • Series: CDCEL9xx
  • Brand: Texas Instruments
  • Interface Type: USB
  • Operating Supply Voltage: 1.8 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

CDCEL913PERF-EVM

CDCEL913PERF-EVM Specifications

CDCEL913PERF-EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Synthesizers

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 230 MHz.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 1.8 V.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Clock & Timer Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top