CDCLVD2102EVM

Mfr. #: CDCLVD2102EVM
製造商: Texas Instruments
描述: Clock & Timer Development Tools CDCLVD2102EVM
生命週期: 製造商新產品
數據表: CDCLVD2102EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCLVD2102EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Clock Buffers type. Frequency range: 200 MHz, 800 MHz Texas Instruments is a trusted brand for quality electronics The minimum operating temperature of this product is - 30 C. 2.5 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

CDCLVD2102EVM Image

CDCLVD2102EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVD2102EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Clock Buffers
  • Tool Is For Evaluation Of: CDCLVD2102
  • Frequency: 200 MHz, 800 MHz
  • Series: CDCLVD2102
  • Brand: Texas Instruments
  • Minimum Operating Temperature: - 30 C
  • Operating Supply Voltage: 2.5 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

CDCLVD2102EVM

CDCLVD2102EVM Specifications

CDCLVD2102EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is Clock Buffers.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 200 MHz, 800 MHz.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 30 C.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 2.5 V.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Clock & Timer Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top