DAC70508EVM

Mfr. #: DAC70508EVM
製造商: Texas Instruments
描述: Data Conversion IC Development Tools DAC80508EVM
生命週期: 製造商新產品
數據表: DAC70508EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC70508EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the DAC type. 2.7 V to 5.5 V operating supply voltage range Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: SPI Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

DAC70508EVM Image

DAC70508EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC70508EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: DAC
  • Tool Is For Evaluation Of: DAC70508EVM
  • Operating Supply Voltage: 2.7 V to 5.5 V
  • Packaging: Bulk
  • Description/Function: Voltage Output DAC with Internal Reference
  • Series: DAC70508
  • Brand: Texas Instruments
  • Interface Type: SPI
  • Operating Supply Current: 20 mA
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DAC70508EVM

DAC70508EVM Specifications

DAC70508EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 2.7 V to 5.5 V.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed SPI

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top