DAC8811EVM

Mfr. #: DAC8811EVM
製造商: Texas Instruments
描述: Data Conversion IC Development Tools DAC8811 Eval Mod
生命週期: 製造商新產品
數據表: DAC8811EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8811EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the DAC type. 5 V to 15 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.094823 oz of Unit Weight

DAC8811EVM Image

DAC8811EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8811EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: DAC
  • Tool Is For Evaluation Of: DAC8811
  • Operating Supply Voltage: 5 V to 15 V
  • Series: DAC8811
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.094823 oz

DAC8811EVM

DAC8811EVM Specifications

DAC8811EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V to 15 V

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.094823 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top