DLPDLCR2010EVM

Mfr. #: DLPDLCR2010EVM
製造商: Texas Instruments
描述: Display Development Tools DLP LightCrafter Display 2010 EVM
生命週期: 製造商新產品
數據表: DLPDLCR2010EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DLPDLCR2010EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules 5 V operating supply voltage range Interface Type: Audio, HDMI, I2C, JTAG, USB Texas Instruments is a trusted brand for quality electronics Display Development Tools product type 1 of 100 Development Tools as subcategory The product's DLP is Blue Gecko. 1. 1.247 lbs of Unit Weight

DLPDLCR2010EVM Image

DLPDLCR2010EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DLPDLCR2010EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Display Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Tool Is For Evaluation Of: DLP2010
  • Operating Supply Voltage: 5 V
  • Interface Type: Audio, HDMI, I2C, JTAG, USB
  • Description/Function: DLP LightCrafter display 2010 evaluation module
  • Series: DLPDLCR2010
  • Brand: Texas Instruments
  • Product Type: Display Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: DLP
  • Unit Weight: 1.247 lbs

DLPDLCR2010EVM

DLPDLCR2010EVM Specifications

DLPDLCR2010EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is Audio, HDMI, I2C, JTAG, USB.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Display Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: At what frequency does the Tradename?

    Q: The product Tradename is DLP.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 1.247 lbs

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top