DP-EXPANSION-EVM

Mfr. #: DP-EXPANSION-EVM
製造商: Texas Instruments
描述: Daughter Cards & OEM Boards DP-EXPANSION-EVM
生命週期: 製造商新產品
數據表: DP-EXPANSION-EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DP-EXPANSION-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules Compatible with TPS6598x. Texas Instruments is a trusted brand for quality electronics Daughter Cards & OEM Boards product type 1 of 100 Embedded Solutions as subcategory

DP-EXPANSION-EVM Image

DP-EXPANSION-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DP-EXPANSION-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Daughter Cards & OEM Boards
  • RoHS: N/A
  • Product: Evaluation Modules
  • For Use With: TPS6598x
  • Description/Function: TPS6598x DisplayPort expansion evaluation module
  • Brand: Texas Instruments
  • Product Type: Daughter Cards & OEM Boards
  • Factory Pack Quantity: 1
  • Subcategory: Embedded Solutions

DP-EXPANSION-EVM

DP-EXPANSION-EVM Specifications

DP-EXPANSION-EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TPS6598x

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Daughter Cards & OEM Boards.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Embedded Solutions

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top