DRV10970EVM

Mfr. #: DRV10970EVM
製造商: Texas Instruments
描述: Power Management IC Development Tools DRV10970EVM
生命週期: 製造商新產品
數據表: DRV10970EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV10970EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 5 V to 18 V Input Voltage Output Voltage is - Output current: 1.5 A Texas Instruments is a trusted brand for quality electronics Compatible with DRV10970. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.146819 oz of Unit Weight

DRV10970EVM Image

DRV10970EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV10970EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Motor / Motion Controllers & Drivers
  • Tool Is For Evaluation Of: DRV10970
  • Input Voltage: 5 V to 18 V
  • Output Voltage: -
  • Description/Function: Three phase brushless motor driver evaluation module
  • Output Current: 1.5 A
  • Series: DRV10970
  • Brand: Texas Instruments
  • For Use With: DRV10970
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.146819 oz

DRV10970EVM

DRV10970EVM Specifications

DRV10970EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Motor / Motion Controllers & Drivers.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 5 V to 18 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is -.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 1.5 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed DRV10970

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 125 C

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.146819 oz.

11 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top