DRV2605EVM-BT

Mfr. #: DRV2605EVM-BT
製造商: Texas Instruments
描述: Power Management IC Development Tools DRV2605EVM-BT
生命週期: 製造商新產品
數據表: DRV2605EVM-BT 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV2605EVM-BT Overview

This product is manufactured by Texas Instruments. Evaluation Kits This device belongs to the Motor / Motion Controllers & Drivers type. 5.5 V Input Voltage Output Voltage is 3.3 V Texas Instruments is a trusted brand for quality electronics Interface Type: I2C The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV2605EVM-BT Image

DRV2605EVM-BT

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV2605EVM-BT Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Kits
  • Type: Motor / Motion Controllers & Drivers
  • Tool Is For Evaluation Of: DRV2605
  • Input Voltage: 5.5 V
  • Output Voltage: 3.3 V
  • Series: DRV2605
  • Brand: Texas Instruments
  • Interface Type: I2C
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV2605EVM-BT

DRV2605EVM-BT Specifications

DRV2605EVM-BT FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: At what frequency does the Type?

    Q: The product Type is Motor / Motion Controllers & Drivers.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 5.5 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 3.3 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top