| Mfr. #: | DRV2667EVM-CT |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools EVM for Piezo Haptic Driver |
| 生命週期: | 製造商新產品 |
| 數據表: | DRV2667EVM-CT 數據表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 3 V to 5.5 V Input Voltage Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Compatible with MSP-EXP430G2. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV2667EVM-CT Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 3 V to 5.5 V.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: Is the cutoff frequency of the product Interface Type?
Q: Yes, the product's Interface Type is indeed I2C, USB
A: At what frequency does the For Use With?
Q: The product For Use With is MSP-EXP430G2.
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 85 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is - 40 C.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.