DRV8303EVM

Mfr. #: DRV8303EVM
製造商: Texas Instruments
描述: Power Management IC Development Tools DRV8303 EVAL MOD
生命週期: 製造商新產品
數據表: DRV8303EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8303EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 8 V to 60 V Input Voltage Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with CCStudio v5.x, XDS100 JTAG Emulator. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV8303EVM Image

DRV8303EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8303EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Motor / Motion Controllers & Drivers
  • Tool Is For Evaluation Of: DRV8303
  • Input Voltage: 8 V to 60 V
  • Description/Function: Evaluation module for three phase pre-driver with dual current shunt amplifiers
  • Series: DRV8303
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: CCStudio v5.x, XDS100 JTAG Emulator
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV8303EVM

DRV8303EVM Specifications

DRV8303EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Motor / Motion Controllers & Drivers.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 8 V to 60 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is CCStudio v5.x, XDS100 JTAG Emulator.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top