| Mfr. #: | DRV8886EVM |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools DRV8886EVM |
| 生命週期: | 製造商新產品 |
| 數據表: | DRV8886EVM 數據表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 8 V to 37 V Input Voltage Output Voltage is 3.3 V Output current: 2 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8886EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 8 V to 37 V
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 3.3 V.
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 2 A
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: What is the Interface Type of the product?
Q: The Interface Type of the product is USB.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.