| Mfr. #: | EVM430-FR6989 |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | Development Boards & Kits - Other Processors Water meter ref Eval Module |
| 生命週期: | 製造商新產品 |
| 數據表: | EVM430-FR6989 數據表 |


This product is manufactured by Texas Instruments. Evaluation Kits This product's MSP430 is an ARM Cortex M3. Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, SPI, UART, USB This product has a Data Bus Width of 16 bit. 3.3 V operating supply voltage range Development Boards & Kits - Other Processors product type 1 of 100 Development Tools as subcategory The product's MSP430 is Blue Gecko.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

EVM430-FR6989 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Kits
A: At what frequency does the Core?
Q: The product Core is MSP430.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is I2C, SPI, UART, USB.
A: Is the cutoff frequency of the product Data Bus Width?
Q: Yes, the product's Data Bus Width is indeed 16 bit
A: Is the cutoff frequency of the product Operating Supply Voltage?
Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V
A: At what frequency does the Product Type?
Q: The product Product Type is Development Boards & Kits - Other Processors.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools
A: At what frequency does the Tradename?
Q: The product Tradename is MSP430.