INA1620EVM

Mfr. #: INA1620EVM
製造商: Texas Instruments
描述: Audio IC Development Tools INA1620 EVALUATION MODULE
生命週期: 製造商新產品
數據表: INA1620EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
INA1620EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Operational Amplifier type. 15 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

INA1620EVM Image

INA1620EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

INA1620EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Operational Amplifier
  • Tool Is For Evaluation Of: INA1620
  • Operating Supply Voltage: 15 V
  • Series: INA1620
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

INA1620EVM

INA1620EVM Specifications

INA1620EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Operational Amplifier.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 15 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Audio IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

14 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top