INA225EVM

Mfr. #: INA225EVM
製造商: Texas Instruments
描述: Amplifier IC Development Tools INA225 EVAL MOD
生命週期: 製造商新產品
數據表: INA225EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
INA225EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Current Sense type. 0 V to 36 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Compatible with INA225. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory

INA225EVM Image

INA225EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

INA225EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Amplifier IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Current Sense
  • Tool Is For Evaluation Of: INA225
  • Operating Supply Voltage: 0 V to 36 V
  • Description/Function: INA225 evaluation module for 36 V programmable gain
  • Series: INA225
  • Brand: Texas Instruments
  • For Use With: INA225
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Operating Supply Current: 0.35 mA
  • Product Type: Amplifier IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

INA225EVM

INA225EVM Specifications

INA225EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Current Sense

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 0 V to 36 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed INA225

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 125 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Amplifier IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top