ISO1211EVM

Mfr. #: ISO1211EVM
製造商: Texas Instruments
描述: Interface Development Tools ISO1211EVM
生命週期: 製造商新產品
數據表: ISO1211EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ISO1211EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Digital Isolator type. Texas Instruments is a trusted brand for quality electronics 5 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

ISO1211EVM Image

ISO1211EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ISO1211EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Digital Isolator
  • Tool Is For Evaluation Of: ISO1211
  • Description/Function: Evaluates the ISO1211 isolated digital-input receiver
  • Series: ISO1211
  • Brand: Texas Instruments
  • Operating Supply Voltage: 5 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ISO1211EVM

ISO1211EVM Specifications

ISO1211EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Digital Isolator.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Interface Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top