LM25019MR-EVM

Mfr. #: LM25019MR-EVM
製造商: Texas Instruments
描述: Power Management IC Development Tools LM25019MR EVAL MOD
生命週期: 製造商新產品
數據表: LM25019MR-EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM25019MR-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Voltage Regulators - Switching Regulators type. 12.5 V to 48 V Input Voltage Output Voltage is 10 V Dimensions of 2.3 in x 1.4 in Output current: 100 mA Texas Instruments is a trusted brand for quality electronics Compatible with LM25019. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.010791 oz of Unit Weight

LM25019MR-EVM Image

LM25019MR-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM25019MR-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Boards
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: LM25019
  • Input Voltage: 12.5 V to 48 V
  • Output Voltage: 10 V
  • Description/Function: Evaluation board provides the design engineer with a fully functional buck regulator, employing the constant on-time operating principles
  • Dimensions: 2.3 in x 1.4 in
  • Output Current: 100 mA
  • Series: LM25019
  • Brand: Texas Instruments
  • For Use With: LM25019
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.010791 oz

LM25019MR-EVM

LM25019MR-EVM Specifications

LM25019MR-EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 12.5 V to 48 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 10 V.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 2.3 in x 1.4 in.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 100 mA

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is LM25019.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.010791 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top