LM3648EVM

Mfr. #: LM3648EVM
製造商: Texas Instruments
描述: LED Lighting Development Tools LM368 Eval Module
生命週期: 製造商新產品
數據表: LM3648EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM3648EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules Compatible with LM3648. This product's LM3648 is an ARM Cortex M3. 2.5 V to 5.5 V operating supply voltage range Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.083330 oz of Unit Weight

LM3648EVM Image

LM3648EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM3648EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: LED Lighting Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • For Use With: LM3648
  • Core: LM3648
  • Operating Supply Voltage: 2.5 V to 5.5 V
  • Series: LM3648
  • Packaging: Bulk
  • Brand: Texas Instruments
  • Product Type: LED Lighting Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.083330 oz

LM3648EVM

LM3648EVM Specifications

LM3648EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the For Use With?

    Q: The product For Use With is LM3648.

  • A: At what frequency does the Core?

    Q: The product Core is LM3648.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 2.5 V to 5.5 V.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is LED Lighting Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.083330 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top