LM5145EVM-HD-20A

Mfr. #: LM5145EVM-HD-20A
製造商: Texas Instruments
描述: Power Management IC Development Tools LM5145 HIGH DENSITY 20A EVM
生命週期: 製造商新產品
數據表: LM5145EVM-HD-20A 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM5145EVM-HD-20A Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Switching Controllers type. 24 V to 72 V Input Voltage Output Voltage is 5 V Dimensions of 50 mm x 30 mm Output current: 20 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.250795 oz of Unit Weight

LM5145EVM-HD-20A Image

LM5145EVM-HD-20A

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM5145EVM-HD-20A Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Switching Controllers
  • Tool Is For Evaluation Of: LM5145
  • Input Voltage: 24 V to 72 V
  • Output Voltage: 5 V
  • Description/Function: Evaluates the LM5145 synchronous buck controller
  • Dimensions: 50 mm x 30 mm
  • Output Current: 20 A
  • Series: LM5145
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.250795 oz

LM5145EVM-HD-20A

LM5145EVM-HD-20A Specifications

LM5145EVM-HD-20A FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Switching Controllers

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 24 V to 72 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 5 V

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 50 mm x 30 mm.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 20 A

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 125 C

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.250795 oz.

13 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top