LMK04616EVM

Mfr. #: LMK04616EVM
製造商: Texas Instruments
描述: Clock & Timer Development Tools LMK04616EVM
生命週期: 製造商新產品
數據表: LMK04616EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMK04616EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Clock Jitters type. Frequency range: 122.88 MHz Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, USB 5 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

LMK04616EVM Image

LMK04616EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMK04616EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Clock Jitters
  • Tool Is For Evaluation Of: LMK04616
  • Frequency: 122.88 MHz
  • Description/Function: Evaluates the LMK04616 dual loop jitter cleaner
  • Series: LMK04616
  • Brand: Texas Instruments
  • Interface Type: SPI, USB
  • Operating Supply Voltage: 5 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LMK04616EVM

LMK04616EVM Specifications

LMK04616EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Clock Jitters.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 122.88 MHz.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is SPI, USB.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Clock & Timer Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top