LMZ20502EVM

Mfr. #: LMZ20502EVM
製造商: Texas Instruments
描述: Power Management IC Development Tools LMZ20502 EVAL MOD
生命週期: 製造商新產品
數據表: LMZ20502EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMZ20502EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the AC/DC Converters type. 2.7 V to 5.5 V Input Voltage Output Voltage is 1.8 V Dimensions of 64 mm x 27 mm Output current: 2 A Texas Instruments is a trusted brand for quality electronics Compatible with LMZ20502. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SIMPLE SWITCHER is Blue Gecko. 1. 0.022743 oz of Unit Weight

LMZ20502EVM Image

LMZ20502EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMZ20502EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Boards
  • Type: AC/DC Converters
  • Tool Is For Evaluation Of: LMZ20502
  • Input Voltage: 2.7 V to 5.5 V
  • Output Voltage: 1.8 V
  • Dimensions: 64 mm x 27 mm
  • Output Current: 2 A
  • Series: LMZ20502
  • Brand: Texas Instruments
  • For Use With: LMZ20502
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SIMPLE SWITCHER
  • Unit Weight: 0.022743 oz

LMZ20502EVM

LMZ20502EVM Specifications

LMZ20502EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed AC/DC Converters

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 2.7 V to 5.5 V

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 1.8 V

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 64 mm x 27 mm

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 2 A

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the For Use With?

    Q: The product For Use With is LMZ20502.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Tradename?

    Q: The product Tradename is SIMPLE SWITCHER.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.022743 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top