| Mfr. #: | LP592201EVM |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools LOW VOTAGE LDO |
| 生命週期: | 製造商新產品 |
| 數據表: | LP592201EVM 數據表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 1.85 V to 6 V Input Voltage Output Voltage is 1.8 V Output current: 2 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP592201EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is LDO Voltage Regulators.
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 1.85 V to 6 V.
A: At what frequency does the Output Voltage?
Q: The product Output Voltage is 1.8 V.
A: What is the Output Current of the product?
Q: The Output Current of the product is 2 A.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.