LP8754EVM

Mfr. #: LP8754EVM
製造商: Texas Instruments
描述: Power Management IC Development Tools LP8754EVM
生命週期: 製造商新產品
數據表: LP8754EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LP8754EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 5 V Input Voltage Output Voltage is 1.67 V Bulk packaging for easy dispensing Output current: 10 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

LP8754EVM Image

LP8754EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP8754EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: LP8754
  • Input Voltage: 5 V
  • Output Voltage: 1.67 V
  • Packaging: Bulk
  • Output Current: 10 A
  • Series: LP8754
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LP8754EVM

LP8754EVM Specifications

LP8754EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 5 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.67 V.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 10 A

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C, USB.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top