MCIMX7D5EVM10SC

Mfr. #: MCIMX7D5EVM10SC
製造商: NXP Semiconductors
描述: Processors - Application Specialized i.MX 7Dual: 2x Cortex A7, 2x USB 2.0 OTG&PHY,PCIe, 2xSDIO/MMC,CAN, 2x Ethernet, Security,Ext.Temp
生命週期: 製造商新產品
數據表: MCIMX7D5EVM10SC 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
MCIMX7D5EVM10SC Overview

This product is manufactured by NXP. The product can operate at a maximum temperature of SMD/SMT. BGA-541 package/case type is utilized by this product. The Consumer Applications for this product. This product's ARM Cortex A7, ARM Cortex M4 is an ARM Cortex M3. This product has a Data Bus Width of 32 bit. The Maximum Clock Frequency of this product is 1 GHz. 1.2 V to 1.25 V operating supply voltage range The minimum operating temperature of this product is - 20 C. The product can operate at a maximum temperature of + 105 C. Tray packaging for easy dispensing This product features DDR3, DDR3L, LPDDR2, LPDDR3 memory type for improved performance and speed. NXP Semiconductors is a trusted brand for quality electronics The Data RAM Size of this product is 256 kB. The Data ROM Size is 96 kB. Interface Type: I2C, JTAG, PCI, SAI, UART Floating Point instruction type supported. Yes regarding Moisture Sensitivity Processors - Application Specialized product type 84 of 100 Processors - Application Specialized as subcategory The product's i.MX is Blue Gecko. This product is also known by the 935325059557 number of 934069005115. 1. 0 oz of Unit Weight

MCIMX7D5EVM10SC Image

MCIMX7D5EVM10SC

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

MCIMX7D5EVM10SC Specifications
  • Manufacturer: NXP
  • Product Category: Processors - Application Specialized
  • RoHS: Y
  • Mounting Style: SMD/SMT
  • Package / Case: BGA-541
  • Series: i.MX 7Dual
  • Application: Consumer Applications
  • Core: ARM Cortex A7, ARM Cortex M4
  • Number of Cores: 3 Core
  • Data Bus Width: 32 bit
  • Maximum Clock Frequency: 1 GHz
  • L1 Cache Instruction Memory: 32 kB, 16 kB
  • L1 Cache Data Memory: 32 kB, 16 kB
  • Operating Supply Voltage: 1.2 V to 1.25 V
  • Minimum Operating Temperature: - 20 C
  • Maximum Operating Temperature: + 105 C
  • Packaging: Tray
  • Memory Type: DDR3, DDR3L, LPDDR2, LPDDR3
  • Brand: NXP Semiconductors
  • Data RAM Size: 256 kB
  • Data ROM Size: 96 kB
  • Interface Type: I2C, JTAG, PCI, SAI, UART
  • I/O Voltage: 3.3 V
  • Instruction Type: Floating Point
  • L2 Cache Instruction / Data Memory: 512 kB
  • Moisture Sensitive: Yes
  • Number of Timers/Counters: 4 Timer
  • Processor Series: i.MX 7Dual
  • Product Type: Processors - Application Specialized
  • Factory Pack Quantity: 84
  • Subcategory: Processors - Application Specialized
  • Tradename: i.MX
  • Watchdog Timers: Watchdog Timer
  • Part # Aliases: 935325059557
  • Unit Weight: 0 oz

MCIMX7D5EVM10SC

MCIMX7D5EVM10SC Specifications

MCIMX7D5EVM10SC FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is NXP.

  • A: What is the Mounting Style of the product?

    Q: The Mounting Style of the product is SMD/SMT.

  • A: What is the Package / Case of the product?

    Q: The Package / Case of the product is BGA-541.

  • A: At what frequency does the Application?

    Q: The product Application is Consumer Applications.

  • A: Is the cutoff frequency of the product Core?

    Q: Yes, the product's Core is indeed ARM Cortex A7, ARM Cortex M4

  • A: Is the cutoff frequency of the product Data Bus Width?

    Q: Yes, the product's Data Bus Width is indeed 32 bit

  • A: At what frequency does the Maximum Clock Frequency?

    Q: The product Maximum Clock Frequency is 1 GHz.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 1.2 V to 1.25 V.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 20 C

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 105 C.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Tray.

  • A: Is the cutoff frequency of the product Memory Type?

    Q: Yes, the product's Memory Type is indeed DDR3, DDR3L, LPDDR2, LPDDR3

  • A: At what frequency does the Brand?

    Q: The product Brand is NXP Semiconductors.

  • A: At what frequency does the Data RAM Size?

    Q: The product Data RAM Size is 256 kB.

  • A: At what frequency does the Data ROM Size?

    Q: The product Data ROM Size is 96 kB.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C, JTAG, PCI, SAI, UART

  • A: Is the cutoff frequency of the product Instruction Type?

    Q: Yes, the product's Instruction Type is indeed Floating Point

  • A: What is the Moisture Sensitive of the product?

    Q: The Moisture Sensitive of the product is Yes.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Processors - Application Specialized.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 84

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Processors - Application Specialized.

  • A: Is the cutoff frequency of the product Tradename?

    Q: Yes, the product's Tradename is indeed i.MX

  • A: Is the cutoff frequency of the product Part # Aliases?

    Q: Yes, the product's Part # Aliases is indeed 935325059557

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top