| Mfr. #: | MRD2EVM |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | RFID Transponder Tools Microreader EVAL BRD |
| 生命週期: | 製造商新產品 |
| 數據表: | MRD2EVM 數據表 |


This product is manufactured by Texas Instruments. Evaluation Kits 2.7 V to 5.5 V operating supply voltage range Frequency range: 134.2 kHz Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, RS232, USB The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. RFID Transponder Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

MRD2EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Kits
A: At what frequency does the Operating Supply Voltage?
Q: The product Operating Supply Voltage is 2.7 V to 5.5 V.
A: What is the Frequency of the product?
Q: The Frequency of the product is 134.2 kHz.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is SPI, RS232, USB.
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 85 C.
A: Is the cutoff frequency of the product Minimum Operating Temperature?
Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C
A: At what frequency does the Product Type?
Q: The product Product Type is RFID Transponder Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools