PCM1864EVM

Mfr. #: PCM1864EVM
製造商: Texas Instruments
描述: Audio IC Development Tools PCM1864EVM-SW Contr Evaluation Module
生命週期: 製造商新產品
數據表: PCM1864EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
PCM1864EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Audio type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with USB-I2X. Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

PCM1864EVM Image

PCM1864EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PCM1864EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: Y
  • Product: Evaluation Boards
  • Type: Audio
  • Tool Is For Evaluation Of: PCM1864
  • Operating Supply Voltage: 5 V
  • Description/Function: Evaluation board for the PCM186x family of ADCs
  • Series: PCM1864
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: USB-I2X
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

PCM1864EVM

PCM1864EVM Specifications

PCM1864EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is Audio.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is USB-I2X.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Audio IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top