SM72295EVM

Mfr. #: SM72295EVM
製造商: Texas Instruments
描述: Power Management IC Development Tools SM72295EVM
生命週期: 製造商新產品
數據表: SM72295EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
SM72295EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Gate Drivers type. Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.291419 oz of Unit Weight

SM72295EVM Image

SM72295EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

SM72295EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Gate Drivers
  • Tool Is For Evaluation Of: SM72295
  • Description/Function: SM72295 full bridge gate driver with integrated current sense amplifier evaluation module
  • Series: SM72295
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.291419 oz

SM72295EVM

SM72295EVM Specifications

SM72295EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Gate Drivers.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.291419 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top