SN65HVD101EVM

Mfr. #: SN65HVD101EVM
製造商: Texas Instruments
描述: Interface Development Tools SN65HVD101 EVAL MOD
生命週期: 製造商新產品
數據表: SN65HVD101EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
SN65HVD101EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the I/O Link type. Texas Instruments is a trusted brand for quality electronics Interface Type: 3-Wire Compatible with SN65HVD101, SN65HVD102. The product can operate at a maximum temperature of + 105 C. The minimum operating temperature of this product is - 40 C. 3.3 V, 5 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

SN65HVD101EVM Image

SN65HVD101EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

SN65HVD101EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: I/O Link
  • Tool Is For Evaluation Of: SN65HVD101, SN65HVD102
  • Description/Function: Helps the designer evaluate device performance
  • Series: SN65HVD101
  • Brand: Texas Instruments
  • Interface Type: 3-Wire
  • For Use With: SN65HVD101, SN65HVD102
  • Maximum Operating Temperature: + 105 C
  • Minimum Operating Temperature: - 40 C
  • Operating Supply Voltage: 3.3 V, 5 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

SN65HVD101EVM

SN65HVD101EVM Specifications

SN65HVD101EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is I/O Link.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is 3-Wire.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is SN65HVD101, SN65HVD102.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 105 C.

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V, 5 V

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Interface Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top