TLV320DAC3101EVM-U

Mfr. #: TLV320DAC3101EVM-U
製造商: Texas Instruments
描述: Audio IC Development Tools TLV320DAC3101EVM-U
生命週期: 製造商新產品
數據表: TLV320DAC3101EVM-U 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLV320DAC3101EVM-U Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.061986 oz of Unit Weight

TLV320DAC3101EVM-U Image

TLV320DAC3101EVM-U

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLV320DAC3101EVM-U Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: E
  • Series: TLV320DAC3101
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.061986 oz

TLV320DAC3101EVM-U

TLV320DAC3101EVM-U Specifications

TLV320DAC3101EVM-U FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.061986 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top