| Mfr. #: | TPA3106D1EVM |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | Audio IC Development Tools TPA3106D1EVM |
| 生命週期: | 製造商新產品 |
| 數據表: | TPA3106D1EVM 數據表 |


This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. 10 V to 26 V operating supply voltage range Output power: 40 W Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3106D1EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Audio Amplifier
A: At what frequency does the Operating Supply Voltage?
Q: The product Operating Supply Voltage is 10 V to 26 V.
A: What is the Output Power of the product?
Q: The Output Power of the product is 40 W.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Product Type?
Q: The product Product Type is Audio IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools