TPA3112D1EVM

Mfr. #: TPA3112D1EVM
製造商: Texas Instruments
描述: Audio IC Development Tools TPA3112D1 Eval Mod
生命週期: 製造商新產品
數據表: TPA3112D1EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA3112D1EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. 8 V to 26 V operating supply voltage range Output power: 25 W Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TPA3112D1EVM Image

TPA3112D1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3112D1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: E
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA3112D1
  • Operating Supply Voltage: 8 V to 26 V
  • Output Power: 25 W
  • Series: TPA3112D1
  • Brand: Texas Instruments
  • Operating Supply Current: 3 A
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPA3112D1EVM

TPA3112D1EVM Specifications

TPA3112D1EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Type?

    Q: The product Type is Audio Amplifier.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 8 V to 26 V

  • A: At what frequency does the Output Power?

    Q: The product Output Power is 25 W.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top