TPA3245EVM

Mfr. #: TPA3245EVM
製造商: Texas Instruments
描述: Audio IC Development Tools TPA3245EVM
生命週期: 製造商新產品
數據表: TPA3245EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA3245EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio Amplifier type. 14 V to 31.5 V operating supply voltage range Dimensions of 180 mm x 120 mm Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 3.704863 oz of Unit Weight

TPA3245EVM Image

TPA3245EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3245EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA3245
  • Operating Supply Voltage: 14 V to 31.5 V
  • Dimensions: 180 mm x 120 mm
  • Series: TPA3245
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 3.704863 oz

TPA3245EVM

TPA3245EVM Specifications

TPA3245EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Audio Amplifier.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 14 V to 31.5 V

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 180 mm x 120 mm.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 3.704863 oz.

14 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top