TPA6135A2EVM

Mfr. #: TPA6135A2EVM
製造商: Texas Instruments
描述: Audio IC Development Tools TPA6135A2 Eval Mod
生命週期: 製造商新產品
數據表: TPA6135A2EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA6135A2EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. 2.5 V to 5.5 V operating supply voltage range Output power: 25 mW Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TPA6135A2EVM Image

TPA6135A2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA6135A2EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA6135A2
  • Operating Supply Voltage: 2.5 V to 5.5 V
  • Output Power: 25 mW
  • Series: TPA6135A2
  • Brand: Texas Instruments
  • Operating Supply Current: 500 mA
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPA6135A2EVM

TPA6135A2EVM Specifications

TPA6135A2EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifier

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 2.5 V to 5.5 V.

  • A: What is the Output Power of the product?

    Q: The Output Power of the product is 25 mW.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top