TPS2066EVM-296

Mfr. #: TPS2066EVM-296
製造商: Texas Instruments
描述: Switch IC Development Tools TPS2066EVM-296 Eval Mod
生命週期: 製造商新產品
數據表: TPS2066EVM-296 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2066EVM-296 Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Switch IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS2066EVM-296 Image

TPS2066EVM-296

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2066EVM-296 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Switch IC Development Tools
  • RoHS: N
  • Tool Is For Evaluation Of: TPS2066DGN
  • Brand: Texas Instruments
  • Product Type: Switch IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS2066EVM-296

TPS2066EVM-296 Specifications

TPS2066EVM-296 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Switch IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top