| Mfr. #: | TPS22958EVM |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools TPS22958EVM |
| 生命週期: | 製造商新產品 |
| 數據表: | TPS22958EVM 數據表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. 600 mV to 5.5 V Input Voltage Output Voltage is 5.5 V Bulk packaging for easy dispensing Output current: 4 A/6 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 105 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.046056 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22958EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Load Switches
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 600 mV to 5.5 V
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 5.5 V
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 4 A/6 A
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 105 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is - 40 C.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: At what frequency does the Unit Weight?
Q: The product Unit Weight is 0.046056 oz.