TPS22962EVM-079

Mfr. #: TPS22962EVM-079
製造商: Texas Instruments
描述: Power Management IC Development Tools TPS22962EVM-079
生命週期: 製造商新產品
數據表: TPS22962EVM-079 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS22962EVM-079 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. 800 mV to 5.5 V Input Voltage Output Voltage is 5.5 V Bulk packaging for easy dispensing Output current: 10 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.147201 oz of Unit Weight

TPS22962EVM-079 Image

TPS22962EVM-079

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22962EVM-079 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Load Switches
  • Tool Is For Evaluation Of: TPS22962
  • Input Voltage: 800 mV to 5.5 V
  • Output Voltage: 5.5 V
  • Packaging: Bulk
  • Output Current: 10 A
  • Series: TPS22962
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.147201 oz

TPS22962EVM-079

TPS22962EVM-079 Specifications

TPS22962EVM-079 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Load Switches.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 800 mV to 5.5 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 5.5 V.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 10 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.147201 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
Top